|
 |



















|
Corporate
|
Department of Children and Family Services
Middletown, CT
Project Type: Construction Manager
Contract Amount: $1.3
Completion Date: 7/15/2009
O,R&L Construction completed the fit-out for Oaks, LLC. 15,000 sq ft of office space for the CT - Department of Children and Family Services. This project tracked the total amount of construction debris generated and the amount of materials recycled, reclaimed or otherwise diverted from landfills. Out of 140.8 tons generated on this project, 98.1 tons were recycled/reclaimed. This equates to 70% debris diversion from the waste stream. Indoor air quality was improved for this project by using low VOC products.
|
|
View of walkway and pavillion on green roof
|
Suresource
Shelton, CT
Project Type: Construction Manager
Designers: Engineering- Michael Horton Associates, Inc.
Contract Amount: 3.4M
Completion Date: 7/30/2007
O,R&L completed a 20,000 square foot additional warehouse with a green roof with a patio.
Links:
http://www.suresource.com
http://www.ctgbc.com
http://www.mha-eng.com
|
|
|
Zaragon
Branford, CT
Project Type: Construction Manager
Completion Date: 3/30/2007
O,R&L renovated a 5,000 square foot tenant fit-out for Tiffany Associates. The existing warehouse was subdivided into three offices, a conference room, restrooms, a kitchen and open space.
|
|
Interior View
|
Suresource
Shelton, CT
Project Type: Construction Manager
Completion Date: 1/15/2005
Interior fit-out of unoccupied space into a recreational game room for employees.
Links:
http://www.suresource.com
|
|
Exterior view of dealership
|
Branhaven Chrysler Jeep
Branford, CT
Project Type: Design Build
Designers: BL Companies
Contract Amount: 4M
Completion Date: 6/30/2004
Design/Build project of 25,000 square foot corporate headquarters and auto dealership for Branhaven Chrysler Jeep.
Included in the design were 18 service bays, a specialized sub-grade exhaust evacuation system, auto doors, inground specialty lift equipment, a 3,000 square foot parts department, a retail speed shop and auto showroom.
The exterior building, situated on seven acres, was a steel erected frame with EIFS and masonry walls.
Links:
http://www.branhaven.fivestardealers.com
http://www.blcom.com
|
|
|
Winstanley Property - Tenant Fit-Outs
Bristol, CT
Project Type: Construction Manager
Contract Amount: 1.75M
Completion Date: 3/1/2003
Renovation of 40,000 square feet of corporate tenant space for Winstanley Enterprises at 383 Middle Street. Included in the renovation was the demolition and office fit-out for ESPN, Superior Electric, Select Energy and Worldfulfillment, Inc.
|
|
Aerial View of corporate campus
|
Williams Distributing
Chicopee, MA
Project Type: Design Build
Designers: S/L/A/M Collaborative - Architect, BVH Engineering
Contract Amount: 5M
Completion Date: 6/1/2001
New construction of a 90,000 square foot state-of-the-art distribution facility for Williams Distributing. The pre-engineered structure, a clear span, no-column design included 26 loading docks, 10,000 square feet of corporate office space and specialized draft coolers for storage of the company’s non-pasteurized product. The exterior building was sheathed with precast insulated Rockwall IPS panels supplied by IPS/Metallic Building Company. The building site was located on a 30 acre undeveloped parcel requiring complete excavation, multiple access roads and parking for truck fleets and other vehicles.
Links:
http://www.slamcoll.com
http://www.bvheng.com
|
|
|
Engyro, Inc.
Shelton, CT
Project Type: General Contractor
Designers: Esposito Design Associates
Completion Date: 11/30/2000
O,R&L Construction completed an interior renovation for Engyro in Shelton. Engyro provides critical business licensing and service information to corporate clients via web-based applications.
|
|
|
Panolam Industries
Shelton, CT
Project Type: General Contractor
Completion Date: 6/1/2000
A 7,500 square foot office interior fit-out for the market leader in the design, manufacturing and distribution of decorative, thermally-fused melamine panels.
Links:
http://www.panolam.com
|
|
View of finished exterior
|
Suresource
Trumbull, Connecticut
Project Type: General Contractor
Designers: Raymond Duda, Architect
Completion Date: 4/1/2000
Construction of a 20,000 square foot addition for Suresource, an on-line shopping distributorship.
President of Suresource, Todd Holson, wrote in a follow-up letter shortly after the move-in; “The building continues to serve us quite well and has been problem free. As we continue to grow, we look forward to working with your firm again.”
Links:
http://www.suresource.com
|
|
|
8 Progress Drive
Shelton, CT
Project Type: General Contractor
Contract Amount: 2M
Completion Date: 8/1/1999
63,000 square foot interior and exterior
renovation.
|
|
20,000 sq ft design-build new office facility
|
Precision Computer Services (PCS)
Shelton, CT
Project Type: Design Build
Designers: Matt Williams, Architect
Completion Date: 7/30/1999
New construction of a 20,000 square foot corporate facility for Precision Computer Services (PCS). The project included corporate offices and a high tech service and support center. O,R&L completed an interior fit-out at the facility for use as a Disaster Recovery Room for protection of client data. This project was a state-of-the-art, climate controlled, clean environment space.
|
|
60,000 sq ft interior and exterior renovation
|
14-16 Progress Drive
Shelton, CT
Project Type: General Contractor
Designers: Matt Williams, Architect
Contract Amount: 2.5M
Completion Date: 1/1/1999
Anton Bauer and Panolam, Inc. required a fit-out of their leased space for use in their research and development operations. Renovation included extensive exterior work including a new roofing system, installation of new windows, structural reinforcement and re-pointing of all brick exteriors. Interior fit-out included layouts for research laboratories and corporate office space, new mechanical, electrical and exhaust systems.
|
|
|
10 Research Parkway
Wallingford, CT
Project Type: General Contractor
Completion Date: 9/1/1998
25,000 square foot interior office fit-out for ADT Security Systems.
|
|
88,000 sq ft interior/exterior building renovation
|
Nortel/Healthsouth Home Health/Phoenix Life - 1290 Silas Deane Highway
Wethersfield, CT
Project Type: General Contractor
Designers: Matt Williams, Architect
Contract Amount: 7M
Completion Date: 4/1/1998
O,R&L Construction completed an extensive rehabilitation to 1290 Silas Deane Highway in Wethersfield, CT. The rehab encompassed over 88,000 square feet of interior and exterior renovation and included tenant fit-outs for Nortel, Healthsouth Home Health and Phoenix Life. Included in the rehab was extensive exterior facade work, interior electrical and mechanical upgrades, installation of a new curtain wall system and extensive interior structural changes.
|
|
|
One Forest Parkway
Shelton, CT
Project Type: General Contractor
Completion Date: 4/1/1998
Late in 1997, O,R&L Construction began exterior and interior structural renovation of this partially constructed building at One Forest Parkway in Shelton, Connecticut. This 80,000 sq ft steel-up construction project was then fit-out for the home of several corporate offices including Dun & Bradstreet, Market Data Retrieval and Allstate Insurance.
O,R&L has continued their relationship with the owner of One Forest Parkway and completed additional fit-out projects in this building. Recently completing a whole building renovation for Dianon, a division of LabCorp. This building was converted to high-tech lab and office space entirely for Dianon.
|
|
11,500 sq ft new office building and tenant fit-up
|
2 Summit Place
Branford, CT
Project Type: Design Build
Completion Date: 1/1/1988
Corporate headquarters of O,R&L Construction
|

|
 |
|

 |
|
|
|